Ritz Carlton, Riyadh
CONSTRUCTION SITE:
492 between guest rooms and suites, 62,000 square feet of event space, a gentlemen’s-only spa, a majestic indoor heated pool, restaurants.
INSTALLATION DETAILS:
In this luxury hotel the regulation of the domestic water temperature and the management of the thermal disinfection of the whole system is entrusted to six flanged electronic mixing valves LEGIOMIX 6000 series. This choice has been taken with the aim to maximize both the comfort level and the guaranteed safety of all the guests.
Six separate water distribution areas supply domestic hot water to the whole structure including rooms, suites, common areas, pool and SPA. Each 6000 series LEGIOMIX unit may have different settings depending on the area it is dedicated to. Each unit, furthermore, is set to carry the thermal disinfection of the system with scheduled timing and temperature. This way the users are protected from Legionella bacteria and the system is considered safe. All the settings may be easily changed acting directly on the digital regulator, which provides/allows the historic data and parameters download.
Due to this high-tech system, Ritz-Carlton can be proud of the level of care it offers to its guests.