Location:   Mashpee Public Schools (Mashpee, Mass.)

Contractor:  Commercial Boiler Systems (Pembroke, Mass.)

Lead:  Bob Lee, President

Product Focus:  LEGIOMIX®

Challenge:  Consistent water temperatures and DHW disinfection

Overview:

Bob Lee, president of Commercial Boiler Systems, Inc., knows how to solve big problems. Some days he is selling and servicing 36 million BTU/hr. portable snowmelter machines to airports; other days he is being asked to revamp the domestic hot water system in an enormous school complex. Known for being an early adopter of innovative technologies, Lee knew that the Caleffi LEGIOMIX® electronic mixing valve would be an excellent fit for accurate domestic hot water (DHW) control and thermal disinfection at the Mashpee High School and adjoining Quashnet Middle School in Mashpee, Mass.

“CALEFFI FIGURES THINGS OUT AND COMES OUT WITH PRODUCTS

THAT ARE EASY FOR THE PERSON IN THE FIELD TO OPERATE AND SERVICE.”

~BOB LEE, PRESIDENT OF COMMERCIAL BOILER SYSTEMS ~

DOWNLOAD